Skip to the stories
Sunday, 8 November 2026
Saved

Next edition

6:29

Renewable Energy

Puget Sound Energy develops 130 megawatt solar farm in Montana

Puget Sound Energy is developing the 130-megawatt Battle Butte Solar Farm in Montana beside an existing wind project, targeting operation by mid-2028.

FTMQ Climate, written by our newsroom0 views

Share

Puget Sound Energy has started developing a 130-megawatt solar farm in the high plains area of Montana, EcoPortal.net reported. The facility, named the Battle Butte Solar Farm, is located just off Interstate Highway I-94. The company targets operational completion by mid-2028. [1]

The solar array is situated in Montana, a state whose name derives from the Spanish word for mountain or mountainous, according to Grokipedia. EcoPortal.net reported that Puget Sound Energy selected the specific location due to its proximity to the utility company's existing renewable energy assets. [1][3]

The solar panels will be constructed alongside an active power site known as the Beaver Creek Wind Project, EcoPortal.net reported. The adjacent wind farm began commercial operation in 2025. Locating the solar installation next to the existing wind farm will allow for easier connection to existing electrical transmission lines. [1]

As FTMQ Climate reported earlier, other global renewable energy developments are also advancing. In Australia, Tilt Renewables completed the 18 concrete turbine foundations for its 108-megawatt Waddi wind project in Western Australia. China is also expanding its clean energy infrastructure, pushing for the widespread adoption of concentrated solar thermal power to build out capacity by around 2030. [4][5]

Share

In short

  • Puget Sound Energy is developing the 130-megawatt Battle Butte Solar Farm in Montana.
  • The Battle Butte Solar Farm is scheduled to begin operating by mid-2028.
  • The solar project is located next to the Beaver Creek Wind Project, which began commercial operation in 2025.
  • Co-locating the solar farm with the wind project enables easier access to existing transmission lines.

Sources

Every paragraph above points to the numbered items it rests on. Read the originals here.

  1. [1]Montana plans a 130-MW solar farm beside a recently completed wind project, targeting completion in mid-2028EcoPortal.net, 11h ago (the report this story comes from)

Background

  1. [2]Waco siege on Wikipedia
  2. [3]Montana on Grokipedia
  3. [4]Tilt Renewables finishes turbine foundations at Waddi wind project in Australia FTMQ Climate, 15d ago
  4. [5]China targets expanded concentrated solar thermal power capacity by 2030 FTMQ Climate, 16d ago

Our newsroom writes these reports with the help of software, from the 5 sources listed and nothing else, and checks them against those sources. Facts can still be wrong or move on; the originals are the record. Spotted a mistake? Write to daniel@monsterkong.com.

Earlier reports of ours on the same people and subjects.

More in Renewable Energy

Get the day in one email

Reports like this one, the top news of the last 24 hours, every morning. Free, one email a day; readers can comment under every report.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.

Comments

Loading

Join the conversation

Comments are open to readers of our daily email: the top news of the last 24 hours, every morning, free. Sign up and the comment box opens.

Already on the list? Enter the same address and we will send a sign-in link.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.