Skip to the stories
Sunday, 18 October 2026
Saved

Next edition

10:34

Grid & Infrastructure

US regulator proposes easing rules for gas pipelines and LNG exports

The Federal Energy Regulatory Commission proposed new measures to fast-track approvals for natural gas pipelines and liquefied natural gas facilities.

FTMQ Climate, written by our newsroom0 views

Share
Picture: Utility Dive

The Federal Energy Regulatory Commission proposed new measures on Thursday to speed up approvals for natural gas infrastructure, including pipelines and liquefied natural gas export facilities. Utility Dive and CleanTechnica reported that the regulator introduced the proposals during its monthly meeting. TradeWinds News reported that the agency proposed a blanket authorization process to accelerate project reviews. [1][2][5]

FERC Chairman Laura Swett stated that the proposals are intended to ensure that gas-fired power plants can access necessary fuel supplies. Utility Dive reported Swett saying that infrastructure bottlenecks represent the only current restriction on getting American natural gas to market. CleanTechnica reported that the agency proposed two new measures to speed up project approvals, while Oil and Gas Middle East noted that the plan includes a three-tier blanket authorization program for facility expansion. [1][2][3]

CleanTechnica reported that environmental advocates warned the proposed measures could allow natural gas projects to gain approval without proper oversight or review of air quality impacts. UA News reported via The Hill that the proposed regulatory changes specifically target the expansion of export terminals across the United States. [2][6]

Separately, LNG Industry reported that the regulator permitted the introduction of feed gas at the Sabine Pass terminal. The regulatory proposals will now face public review and comment before final implementation decisions are made. [1][4]

Share

In short

  • FERC proposed new rules to speed up approvals for natural gas pipelines and LNG export facilities.
  • FERC Chairman Laura Swett cited infrastructure bottlenecks as the main limit on supplying gas-fired power plants.
  • The regulatory agency proposed a three-tier blanket authorization program for LNG projects.

Sources

Every paragraph above points to the numbered items it rests on. Read the originals here.

  1. [1]FERC proposes easing regulatory pathway for gas pipeline, LNG projectsUtility Dive, 1d ago (the report this story comes from)
  2. [2]FERC Proposes Blanket Authorization of Certain LNG Projects & Drafts Measures to Weaken Air Quality Reviews of Methane Gas ProjectsCleanTechnica, 1d ago
  3. [3]FERC proposes three-tier blanket authorisation programme for LNG facilitiesOil & Gas Middle East, 1d ago
  4. [4]FERC permits introduction of feed gas for Sabine PassLNG Industry, 1d ago
  5. [5]US regulator FERC proposes ‘blanket authorisation’ to speed up LNG projectsTradeWinds News, 1d ago
  6. [6]FERC in the US proposes speeding up LNG terminal expansions — The HillUA.NEWS, 1d ago

Our newsroom writes these reports with the help of software, from the 6 sources listed and nothing else, and checks them against those sources. Facts can still be wrong or move on; the originals are the record. Spotted a mistake? Write to daniel@monsterkong.com.

Earlier reports of ours on the same people and subjects.

More in Grid & Infrastructure

Get the day in one email

Reports like this one, the top news of the last 24 hours, every morning. Free, one email a day; readers can comment under every report.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.

Comments

Loading

Join the conversation

Comments are open to readers of our daily email: the top news of the last 24 hours, every morning, free. Sign up and the comment box opens.

Already on the list? Enter the same address and we will send a sign-in link.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.